Maintaining Safe and Functional School Buildings
The Puyallup School District maintains school buildings through the Capital Budget. This budget is funded primarily by two voter‑approved sources:
- Capital Levies
- Bonds
These funds support system repairs, building upgrades, and long‑term facility needs. Families play a key role in this work by approving local funding that keeps schools safe and operational.

How We Use Funding to Protect Learning Environments
We want families to understand how the district uses limited capital dollars responsibly. When funding is tight, the district must make careful decisions to protect student learning environments. This often means:
- Repairing critical systems in one building while delaying less urgent work in another
- Addressing safety risks and potential system failures before cosmetic or comfort‑based improvements
- Extending the life of older buildings through targeted repairs rather than full system replacements
These decisions rely on facility data, condition assessments, and long‑term planning. They reflect the need to balance limited resources across many schools.
Why Funding Levels Differ Between Schools
Investment levels sometimes vary from school to school. For example, Mt. View or Waller Road may require more repair funding than Northwood or Dessie Evans in a given year. This difference is based on:
- Building age
- Condition of mechanical, electrical, and structural systems
- Identified risks and likelihood of system failure
It is not a reflection of school importance. Limited funds must go to the most urgent needs first to prevent failures and maintain safe operations across the district.
Continued Learning
Understanding Public Funding
It's understandable to have questions about how schools in Washington receive the funding they need to operate. The state provides school districts with funding for "basic education" based on a "prototypical model", which is the Legislature's assumptions of what resources are needed for basic education.
Protecting Our Schools Through Asset Preservation
PSD uses an Asset Preservation Program (APP) to monitor, assess, and maintain building systems. The program helps identify issues early, reducing costly emergency repairs in the future.

The Cost of Delay: Understanding Deferred Maintenance
Every building has an expected lifespan for major systems such as:
- Roofs
- Heating and cooling systems
- Electrical wiring
- Plumbing
When repairs are delayed because of limited budgets, these systems continue to age past their useful life. This increases the likelihood of breakdowns and raises long‑term costs.

Aging buildings with poorly rated conditions do not see the same impact from renovations as newer ones. Obsolete equipment and infrastructure often make repairs overly expensive and ultimately ineffective. The above chart from the Citizens Facility Advisory Committee Report describes the life cycle of a building, showing at a high level when renovations are adequate and when it makes the best sense to modernize and replace.

What Deferred Maintenance Means
Deferred maintenance is work that should be completed but is postponed due to limited funding. Examples include:
- A 30‑year‑old roof that can be patched but will eventually fail
- A 40‑year‑old heating and cooling system that breaks down more often and costs more to repair
As delays accumulate, the backlog grows and costs increase. Older buildings typically have more deferred maintenance because they have gone longer without system replacements.
Many PSD schools-built decades ago still rely on original mechanical, electrical, or plumbing systems. These aging systems require frequent emergency repairs and temporary fixes.
In 2021, the Citizens Facilities Advisory Committee reported significant findings from the district’s condition assessment. Spinning Elementary received the lowest score, showing that much of its equipment has exceeded its expected lifespan.

Continued Learning
How Projects Were Selected for the 2024 Capital Levy
Projects included in the 2024 Capital Levy were identified through the district’s documented list of observed building deficiencies and a rubric of risk. Staff reviewed the issues that carried the highest level of risk to school operations, focusing on needs that were already more than five years overdue or that posed a significant threat to core services if left unaddressed. These priority items formed the basis of the levy project list.
If a Capital Levy project is completed under budget, any remaining savings are directed to the next highest‑priority needs or to new high‑risk issues that emerge during the levy period. This ensures that every dollar is used to address the most critical facility challenges and protect safe learning environments.

Long‑Term Planning
Since the last voter‑approved bond in 2015, the district has continued to:
- Conduct facility condition assessments
- Prioritize health and safety repairs
- Complete preventative maintenance
- Phase projects as funding allows
- Plan for long‑term system replacements
More than 80 community members, including parents, residents, and specialists in construction and design, have participated in:
- The Capital Facility Advisory Committee
- The School Capacity and Utilization Task Force
- Bond Advisory Committee
These groups have studied district needs and provided recommendations to support PSD’s growing K‑12 enrollment.
Even without new bond funding, the district continues planning work to ensure school buildings remain safe, functional, and supportive of student learning.


District Priority #5: Facilities, Safety, and Security
The district will ensure the timely repair and maintenance of schools and support facilities in order to maintain a safe work and learning environment for students and staff.
Contact Capital Projects
Brady Martin
Director of Capital Projects
Shelby Rice
Capital Projects Administrative Assistant
(253) 841-8641
FACILITIES PLANNING
Brian Devereux
Facilities Planning Director
(253) 841-8772